Contents
2.5 LANDSCAPE AND VISUAL Monitoring
2.8 IMPLEMENTATION STATUS OF
ENVIRONMENTAL MITIGATION MEASURES
2.9 Summary of Exceedances of the
Environmental Quality Performance Limit
2.10 Summary of
Complaints, Notification of Summons and Successful Prosecutions
Annex
B
ENVIRONMENTAL MITIGATION IMPLEMENTATION SCHEDULE
Annex
C
MONITORING SCHEDULE FOR THIS REPORTING PERIOD
Annex D
Air Quality
Annex
D1 CALIBRATION
CERTIFICATES FOR DUST MONITORING EQUIPMENT
Annex
D2 24-HOUR
TSP MONITORING RESULTS
Annex
D3 EVENT
AND ACTION PLAN FOR AIR QUALITY MONITORING
Annex
D5 CERTIFICATES
OF THE QUALIFIED ODOUR PANELIST
Annex
D6 ODOUR
MONITORING RESULTS
Annex
D8 INVESTIGATION REPORTS OF ENVIRONMENTAL QUALITY
LIMIT EXCEEDANCE
Annex E
Noise
Annex
E1
CALIBRATION CERTIFICATES FOR NOISE MONITORING EQUIPMENT
Annex
E2
NOISE MONITORING RESULTS
Annex
E3
EVENT AND ACTION PLAN FOR NOISE MONITORING
Annex F
Water Quality
Annex
F1
CALIBRATION CERTIFICATES FOR SURFACE WATER QUALITY MONITORING EQUIPMENT
Annex
F2
SURFACE WATER QUALITY MONITORING RESULTS
Annex
F3
EVENT AND ACTION PLAN FOR WATER QUALITY MONITORING
Annex
F4
CALIBRATION CERTIFICATES FOR EFFLUENT QUALITY MONITORING EQUIPMENT
Annex
F5
LEACHATE LEVELS MONITORING RESULTS
Annex
F6
EFFLUENT QUALITY MONITORING RESULTS
Annex
F7
CALIBRATION CERTIFICATES FOR GROUNDWATER MONITORING EQUIPMENT
Annex
F8
GROUNDWATER MONITORING RESULTS
Annex G
Landfill Gas
Annex
G2 CALIBRATION
CERTIFICATES FOR LANDFILL GAS MONITORING EQUIPMENT
Annex
G3 LANDFILL
GAS MONITORING RESULTS
Annex I MONITORING SCHEDULE FOR THE NEXT REPORTING PERIOD
This
Monthly EM&A report presents the EM&A works carried out during the
period from 1 to 31 January 2026 for the Project in accordance with the updated
EM&A Manual.
Seven exceedances of the
Action and Limit Levels for Total Suspended Particulates (TSP) were recorded
for air quality monitoring in the reporting period. The TSP exceedances at
AM1 and AM2 on 3 January 2026 were attributed to Project-related activities
upon further investigation, while the TSP exceedances at AM3 on 3 January 2026,
9 January 2026, 15 January 2026 and 27 January 2026, and at AM4 on 9 January
2026 were considered as non Project-related
upon further investigation.
No
exceedance of Action and Limit Levels for operation/restoration phase noise
monitoring was recorded in the reporting period.
No
exceedance of Action and Limit Levels for operation/ restoration phase water
quality monitoring was recorded in the reporting period.
No
exceedance of Action and Limit Levels for operation/restoration phase landfill
gas monitoring was recorded in the reporting period.
There
were no complaints, notification of summons or
prosecution recorded in the reporting period.
There was
no reporting change in the reporting period.
Potential
environmental impacts arising from the upcoming construction/ operational
activities in the next reporting period of February 2026 are mainly associated
with dust emission from the exposed area and loading and unloading operation of
dusty materials.
The SENT Landfill Extension (SENTX) forms an integral part in the
Strategic Plan in maintaining the continuity of landfill capacity in the Hong
Kong for the cost-effective and environmentally satisfactory disposal of waste.
The Environmental Impact Assessment (EIA) Report and the associated Environmental
Monitoring and Audit (EM&A) Manual for the construction, operation,
restoration and aftercare of the SENTX (hereafter referred to as “the Project”)
have been approved under the Environmental Impact Assessment Ordinance
(EIAO) in May 2008 (Register No.: AEIAR-117/2008) (hereafter referred to as the
approved EIA Report) and an Environmental Permit (EP-308/2008) (EP) was granted
by the Director of Environmental Protection (DEP) on 5 August 2008.
Since then,
applications for Variation of an Environmental Permit (No. VEP-531/2017) were
submitted to EPD and the Variation of Environmental Permits (EP-308/2008/A and
EP-308/2008/B) were granted on 6 January 2012 and 20 January 2017,
respectively, as the Hong Kong SAR Government has decided to reduce the scale
of the design scheme of SENTX assessed in the approved EIA Report and SENTX
will only receive construction waste. In May 2018, a Further Environmental
Permit (FEP) (FEP-01/308/2008/B) was granted to the SENTX’s
contractor, Green Valley Landfill, Limited (GVL). In February 2024, VEPs
(EP-308/2008/C and FEP-01/308/2008/C) were granted to the Environmental
Infrastructure Division of EPD and GVL, regarding updates on alternative
measures to minimise surface odour
emission. Afterwards, VEPs (EP-308/2008/D and FEP-01/308/2008/D) were granted
to the Environmental Infrastructure Division of EPD and GVL on 17 April 2025
for the updates on the extension of waste boundary of SENTX area.
ERM-Hong
Kong, Limited (ERM) and Meinhardt Infrastructure and Environment Limited
(Meinhardt) are commissioned to undertake the roles of Environmental Team (ET)
and the Independent Environmental Checker (IEC), respectively, to undertake the
EM&A activities for the Project in accordance with the requirements
specified in the EP, updated EM&A Manual ([1]), approved EIA Report ([2]) taking account of the latest
design and other relevant statutory requirements.
The SENTX
is a piggyback landfill, occupying the southern part of the existing SENT
Landfill (including its infrastructure area) and 13 ha of Tseung Kwan O (TKO)
Area 137. A layout plan of the SENTX is shown in Figure 1.1. Under the latest design, the SENTX has a
net void capacity of about 7.29 Mm3 and provides an additional
lifespan of about 6 years, commencing operation upon exhaustion of the SENT Landfill.
The SENTX will receive construction waste only.
The key
implementation milestones of the Project are indicatively summarised
in Table 1.1. The construction works and operation of the Project
commenced on 2 January 2019 and 21 November 2021, respectively.
Table 1.1 Estimated Key Dates of Implementation
Programme
|
Key Stage of the Project |
Indicative Date |
|
Start
construction |
2
January 2019 |
|
Commissioning of new
infrastructure facilities |
2020 |
|
Demolition of existing
infrastructure facilities |
2021 |
|
Start waste intake at SENTX |
21
November 2021 |
|
Estimated exhaustion date of SENTX |
2027 |
|
End of aftercare for SENTX |
2059 |
The major
construction works of the SENTX includes:
• Site formation at the TKO Area 137
and the existing infrastructure area at SENT Landfill;
• Construction of surface and
groundwater drainage systems;
• Construction of the leachate
containment and collection systems;
• Construction of new leachate and
landfill gas treatment facilities, site offices, maintenance yards at the new
infrastructure area;
• Construction of new pipelines to
transfer the leachate and landfill gas collected from the existing SENT
Landfill to the treatment facilities at the new infrastructure area;
• Construction of the site access and
new waste reception facilities; and
• Demolition of the facilities at the
existing SENT Landfill infrastructure area.
This is
the Monthly EM&A Report for the Project which summarises
the key findings of the EM&A programme during the
reporting period from 1 to 31 January 2026 for the construction and operation
works.
The organisation structure of the Project is presented in Figure
1.2.
Figure
1.2 Organisation Chart

Contact
details of the key personnel are summarised in Table
1.2 below.
Table 1.2 Contact Information of Key Personnel
|
Party |
Position |
Name |
Telephone |
|
Contractor
(Green
Valley Landfill Limited) |
Project
Manager |
Carl
Lai |
2706
8829 |
|
Environmental Team (ET) (ERM-Hong Kong, Limited) |
ET
Leader |
Terence
Fong |
2271
3156 |
|
Independent Environmental Checker
(IEC) (Meinhardt Infrastructure and Environment Limited) |
IEC |
Claudine
Lee |
2859
5409 |
The programme of the construction is shown in Annex A. As informed by the
Contractor, the major works carried out in this reporting period include:
·
Maintenance
and improvement of temporary surface water drainage; and
·
Restoration
of Phase 1, Phase 2, Phase 3 and Phase 4 slopes.
The
implementation schedule of the mitigation measured recommended in the Updated
EM&A Manual is presented in Annex
B.
The status
for all environmental aspects are presented in Table
1.3. The EM&A requirements remained unchanged during the
reporting period.
Table 1.3 Summary of Status for the Environmental Aspects
under the Updated EM&A Manual
|
Parameters |
Status |
|
Air
Quality |
|
|
Baseline Monitoring |
The results of baseline air
quality monitoring were reported in Baseline Monitoring Report and
Pre-operation Baseline Monitoring Report and submitted to EPD under EP
Condition 3.3 |
|
Impact Monitoring |
On-going |
|
Noise |
|
|
Baseline Monitoring |
The results of baseline noise
monitoring were reported in Baseline Monitoring Report and submitted to EPD
under EP Condition 3.3 |
|
Impact Monitoring |
On-going |
|
Water Quality |
|
|
Baseline Monitoring |
The results of baseline surface
water quality monitoring were reported in Baseline Monitoring Report and
Pre-operation Baseline Monitoring Report and submitted to EPD under EP
Condition 3.3 |
|
Impact Monitoring |
On-going |
|
Landfill Gas |
|
|
Impact Monitoring |
On-going |
|
Waste
Management |
|
|
Waste Monitoring |
On-going |
|
Landscape
and Visual |
|
|
Baseline Monitoring |
The results of baseline landscape
and visual monitoring were reported in Baseline Monitoring Report and
submitted to EPD under EP Condition 3.3 |
|
Operation Phase Audit |
On-going |
|
Site Environmental Audit |
|
|
Regular Site Inspection |
On-going |
|
Complaint Hotline and Email
Channel |
On-going |
|
Environmental Log
Book |
On-going |
Taking into account the operation works, impact
monitoring of air quality, noise, water quality, landfill gas and waste
management were carried out in the reporting period. The impact monitoring
schedule of air quality, noise, water quality and landfill gas monitoring are
provided in Annex C.
The
EM&A programme also involved environmental site
inspections and related auditing conducted by the ET for checking the
implementation of the required environmental mitigation measures recommended in
the approved EIA Report and relevant EP submissions. To promote the environmental awareness and enhance the environmental
performance of the contractors, environmental trainings
and regular environmental management meetings were conducted during the
reporting period, which are summarized as below:
·
One
environmental management meeting was held with the Contractor, ET, IEC and EPD
on 14 January 2026; and
·
Environmental
toolbox training on VOC and Smog and Green Procurement was provided on 31
January 2026 and by the Contractor to the workers.
The status
of statutory environmental compliance with the EP conditions under the EIAO,
submission status under the EP and implementation status of mitigation measures
are presented in Table 1.4.
Table 1.4 Status of Submissions required under the EP and
Implementation Status of Mitigation Measures
|
EP Condition |
Submission /
Implementation Status |
Status |
|
2.3 |
Management Organisation
of Main Construction Companies |
Submitted and accepted by EPD. |
|
2.4 |
Setting up of Community Liaison
Group |
Community Liaison Group was set
up. |
|
2.5 |
Submission of Detailed Landfill
Gas Hazard Assessment Report |
Submitted and accepted by EPD on
10 January 2019. |
|
2.6 |
Submission of Restoration and
Ecological Enhancement Plan |
Submitted to EPD on 28 June 2019. |
|
2.7 |
Setting up of Trial Nursery |
Trial Nursery works
was commenced on 28 August 2019. |
|
2.8 |
Advance Screen Planting |
Advance Screen Planting works were
completed on 28 June 2019. |
|
2.9 |
Provision of Multi-layer Composite
Liner System |
Under implementation. |
The
environmental licenses and permits (including EP, Water Pollution Control
Ordinance (WPCO) discharge license, registration as a chemical waste
producer, and construction noise permit) that are valid in the reporting period
are presented in Table 1.5. No non-compliance with environmental
statutory requirements was identified.
Table 1.5 Status of Statutory Environmental Requirements
|
Description |
Ref No. |
Status |
|
Environmental
Permit |
EP-308/2008 |
Granted on 5 August 2008 |
|
Variation of Environmental Permit |
EP-308/2008/A |
Granted on 6 January 2012 |
|
EP-308/2008/B |
Granted on 20 January 2017 |
|
|
EP-308/2008/C |
Granted on 29 February 2024 |
|
|
EP-308/2008/D |
Granted on 17 April 2025 |
|
|
Further Environmental Permit |
FEP-01/308/2008/B |
Granted on 16 May 2018 |
|
FEP-01/308/2008/C |
Granted on 29 February 2024 |
|
|
FEP-01/308/2008/D |
Granted on 17 April 2025 |
|
|
Water Discharge License under WPCO
(Permit Holder: GVL) |
Licence No.: WT10003277-2024 |
Validity from 23 August 2024 to 30
June 2026 |
|
Billing Account for Disposal of
Construction Waste |
Chit Account Number: 5001692 |
Approved on 28 December 2005 |
|
Registration as a Chemical Waste
Producer (Permit Holder: GVL) |
5296-839-G2228-01 |
Issued on 31 December 2015 |
|
Construction Noise Permit (Permit
Holder: GVL) |
GW-RE1073-25 |
Validity from 15 September 2025 to
14 March 2026 |
The
EM&A programme for the Project required
environmental monitoring for air quality, noise, water quality and landfill gas
as well as environmental site inspections for air quality, noise, water
quality, landfill gas, waste management, and landscape and visual impacts. The
EM&A requirements and related findings for each component are summarised in the following sections.
According
to the updated EM&A Manual of the Project, impact dust monitoring (in term
of Total Suspended Particulates (TSP)) was carried out at the four designated
locations along the site boundary (i.e. AM1, AM2, AM3 and AM4) during the
operation/restoration phase, at a 6-day interval. Due to the waste filling
activities for Phase 7 and Phase 10 for the SENTX Landfill, AM1 will be
temporarily relocated to ensure that the waste filling activities can be
carried out safely and smoothly. Upon completion of the waste filling activities
for Phase 7 and Phase 10 for the SENTX Landfill, the temporary relocation of
AM1 would be ceased, and AM1 would be restored back to its original location.
The proposed temporary relocation of AM1 (named “AM1-TEMP”) has been agreed and
verified by the IEC and approved by EPD on 24 November 2025. The relocation
work of AM1 was completed on 6 January 2026, and the dust monitoring at
AM1-TEMP commenced on 9 January 2026.
The Action
and Limit Levels of the dust monitoring are provided
in Table 2.1 below.
Table 2.1 Action and Limit Levels for 24-hour TSP
|
Monitoring Station |
Action Level |
Limit Level |
|
AM1/AM1-TEMP
- SENTX Site Boundary (North) |
• 260 µg m-³ |
• 260 µg m-³ |
|
AM2 -
SENTX Site Boundary (West, near DP3) |
||
|
AM3 - SENTX Site Boundary (West,
near RC15) |
||
|
AM4 - SENTX Site Boundary (West,
near EPD building) |
High volume air samplers (HVSs) in compliance with the specifications
listed under Section 3.2.2 of the updated EM&A Manual were used to measure
24-hour TSP levels at the dust monitoring stations. The HVSs were calibrated
upon installation and thereafter at bi-monthly intervals to check the validity
and accuracy of the results.
The
equipment used in the impact dust monitoring programme
and monitoring locations are summarised in Table
2.2 and illustrated in Figure 2.1b, respectively. Copies of the
calibration certificates for the equipment are presented in Annex D1.
Table 2.2 Dust Monitoring Details
|
Monitoring Station |
Location |
Parameter |
Frequency and Duration |
Monitoring Dates |
Equipment |
|
AM1/AM1-TEMP |
SENTX
Site Boundary (North) |
• 24-hour TSP |
• Once every 6 days |
• 3, 9, 15, 21, 27 Jan 2026 |
·
Tisch TE-5170 (S/N: 3976) |
|
AM2 |
SENTX
Site Boundary (West, near DP3) |
·
Tisch TE-5170 (S/N: 3573) |
|||
|
AM3 |
SENTX Site Boundary (West, near
RC15) |
·
Tisch TE-5170 (S/N: 3572) |
|||
|
AM4 |
SENTX Site Boundary (West, near
EPD building) |
·
Tisch TE-5170 (S/N: 3957) |
The
schedule for dust monitoring during the reporting period is provided in Annex C.
The
monitoring results for 24-hour TSP are summarised in Table
2.3. The detailed monitoring results and the graphical presentation of the
24-hour TSP results at each monitoring location are provided in Annex D2.
Table 2.3 Summary of 24-hour TSP Monitoring Results in the
Reporting Period
|
Monitoring Station Location |
Average 24-hr TSP Concentration (µg m-3) (Range in bracket) |
Action Level (µg/m3) |
Limit Level (µg/m3) |
|
AM1 /
AM1-TEMP - SENTX Site Boundary (North) |
159
(82 – 275) |
260 |
260 |
|
AM2 -
SENTX Site Boundary (West, near DP3) |
211
(120 – 408) |
260 |
260 |
|
AM3 - SENTX Site Boundary (West,
near RC15) |
370 (154 – 538) |
260 |
260 |
|
AM4 - SENTX Site Boundary (West,
near EPD building) |
245 (168 – 344) |
260 |
260 |
The major dust sources in the reporting period included waste tipping
activities, traffic emission and fugitive dust emission from restoration work
and active earthworks of Cell 4X in SENTX, and traffic emissions from nearby
operations of the TKO Area 137 Fill Bank as well as construction works from the
nearby WSD project site.
Action and
Limit Levels exceedances were recorded for TSP monitoring in the reporting
period and actions in accordance with the Event and Action Plan presented in Annex D3 were undertaken.
Investigation of the Action and Limit Levels exceedance was conducted
and the investigation report is presented in Annex D8.
Based
on the investigation conducted for the monitoring events with potential Action
and Limit Levels exceedances with the Contractor and the IEC, the TSP
exceedances at AM1 and AM2 on 3 January 2026 were attributed to Project-related
activities, while the TSP exceedances at AM3 on 3 January 2026, 9 January 2026,
15 January 2026 and 27 January 2026, and at AM4 on 9 January 2026 were
considered as non Project-related.
The
Contractor was reminded to implement all relevant mitigation measures for the
construction and operation works and maintain good site practice. The ET will
keep track on the monitoring data and ensure
Contractor’s compliance of the environmental
requirements.
Meteorological
data obtained from the SENTX on-site meteorological monitoring station was used
for dust monitoring and is shown in Annex D4. It is considered that meteorological data
obtained at the on-site meteorological monitoring station is representative of
the Project area and could be used for the operation/restoration phase dust
monitoring programme for the Project.
According
to the updated EM&A Manual of the Project, odour
patrol was carried out along the site boundary during the operation/
restoration phase.
During the
first month of operation, daily odour patrol (3 times
per day) was conducted jointly by the ET and the IEC. The odour
intensity detected was based on that determined by the IEC. In addition, an
independent party (ALS Technichem (HK) Pty Ltd.) was
appointed to undertake odour patrol together with the
ET and IEC three times per week. During these patrols, the odour
intensity detected was based on that determined by the independent third party.
Reduction
of odour monitoring frequency from Period 1 (daily,
three times per day) to Period 2 (weekly) was approved by EPD on 4 February
2022. Weekly odour patrol was conducted jointly
by the ET and the IEC from 10 February 2022. In addition, an independent
party (ALS Technichem (HK) Pty Ltd.) was appointed to
undertake odour patrol together with the ET and IEC
once every two weeks.
Reduction
of odour monitoring frequency from Period 2 (weekly)
to Period 3 (monthly) was approved by EPD on 2 June 2022. Monthly odour patrol was conducted jointly by the ET and the IEC
from 28 June 2022. In addition, an independent party (ALS Technichem (HK) Pty Ltd.) was appointed to undertake odour patrol together with the ET and IEC quarterly.
Furthermore, the odour patrol route has been reviewed
against the latest construction / operation programme
and approved by EPD on 17 June 2024.
The Action
and Limit Levels for odour patrol is
provided in Table 2.4 below.
Table 2.4 Action and Limit Levels for Odour Patrol
|
Parameter |
Action Level |
Limit Level |
|
Perceived
odour intensity and odour
complaints |
· Odour
intensity ≥ Class 2 recorded; or · One
documented complaint received |
· Odour
intensity ≥ Class 3 recorded on 2 consecutive patrol
(a) (b) |
|
Notes: (a) i.e. either Class 3-strong or
Class 4-extreme odour intensity. (b) The exceedances of the odour
intensity do not need to be recorded at the same location. |
||
Odour patrol was conducted by trained
personnel/competent persons with a specific sensitivity to a reference odour (i.e. on reference materials n-butanol with the
concentration of 50ppm in nitrogen (v/v)) in compliance with Section 3.7.2 of
the updated EM&A Manual patrolling and sniffing along the SENTX Site
boundary to detect any odour.
The odour monitoring programme and
patrol route are summarised in Table 2.5 and
illustrated in Figure 2.2
respectively. Copies of the certificates of the qualified odour panelist are presented in Annex D5.
Table 2.5 Odour Monitoring Details
|
Patrol Locations |
Parameters |
Patrol Frequency (a) |
Monitoring Dates |
|
Patrol
along the SENTX Site Boundary (Checkpoints OP1 – OP17) |
Odour
Intensity (see Table 2.6) |
Period 1 -
First month of operation Daily, three
times a day in the morning, afternoon and evening/night (between 18:00 and
22:00 hrs) conducted by the ET and the IEC Three times
per week on different days conducted by an independent third party together
with the ET and IEC (b) Period 2 -
Three months following period 1 (c) Weekly
conducted by the ET and the IEC Once every
two weeks conducted by an independent third party together
with the ET and IEC (b) Period 3 -
Throughout operation following period 2 (c) Monthly
conducted by the ET and the IEC Quarterly
conducted by an independent third party together with the ET and IEC (b) |
Conducted by
ET & IEC: 16 Jan 2026 Conducted by
an independent third party, ET & IEC: - |
|
Notes: (a) Reduction of monitoring
frequency will be subject to the monitoring results to demonstrate environmentally
acceptable performance. (b) Patrol shall be scheduled so
that they are carried out together with the patrols to be carried out jointly
by the ET and the IEC. (c) Commencement
of each period will be justified by the ET Leader and verified by
the IEC and will be subject to agreement with the EPD (EIAO Authority) and
Project Proponent. |
|||
Table 2.6 Odour Intensity Level
|
Class |
Odour Intensity |
Description |
|
0 |
Not
Detected |
No odour perceived or an odour so weak
that it cannot be easily characterised or
described. |
|
1 |
Slight
|
Identified
odour, slight |
|
2 |
Moderate |
Identified
odour, moderate |
|
3 |
Strong
|
Identified
odour, strong |
|
4 |
Extreme
|
Severe
odour |
The
schedule for odour patrol during the reporting period
is provided in Annex C.
The odour monitoring results are summarised
and provided in Table 2.7 and Annex D6, respectively.
Table 2.7 Summary of Odour Monitoring Results in the
Reporting Period
|
Odour Checkpoints |
Odour Intensity Class |
Action Level |
Limit Level |
|
OP1 |
0 |
Odour
intensity ≥ Class 2 recorded |
Odour
intensity ≥ Class 3 recorded on 2 consecutive patrol |
|
OP2 |
1 |
||
|
OP3 |
0 |
||
|
OP4 |
0 |
||
|
OP5 |
0 |
||
|
OP6 |
0 |
||
|
OP7 |
0 |
||
|
OP8 |
0 |
||
|
OP9 |
1 |
||
|
OP10 |
0 |
||
|
OP11 |
0 |
||
|
OP12 |
0 |
||
|
OP13 |
0 |
||
|
OP14 |
0 |
||
|
OP15 |
0 |
||
|
OP16 |
0 |
||
|
OP17 |
1 |
The potential odour source in the reporting
period included exhaust gas from sprinkler cars and waste from tipping area at
SENTX as well as painting work at Towngas Plant. All
the odour monitoring results were below the Action
and Limit Levels in the reporting period. No action is thus required to be undertaken in accordance with the Event and
Action Plan presented in Annex
D3.
According
to the updated EM&A Manual of the Project, the performance of the thermal oxidiser, landfill gas flare and landfill gas generator was
monitored when they are in operation. Gas samples were collected from the stack
of the thermal oxidiser,
landfill gas flare and landfill gas generator for laboratory analysis for NO2,
CO, SO2, Benzene and Vinyl chloride and in-situ analysis for
exhaust gas velocity at monthly interval and for laboratory analysis for
non-methane organic compounds and ammonia (for thermal oxidiser only) at quarterly interval. The operating conditions of the thermal oxidiser, landfill gas flare and landfill gas generator
were also monitored continuously.
The stack
emission monitoring frequency of the landfill gas generator was reduced from
monthly to quarterly interval, and the monitoring of non-methane organic
compounds was terminated upon agreement by the EIAO Authority, IEC and Project
Proponent on 30 July 2025, effective from August 2025 onwards.
The Limit
Levels for stack emission of the thermal oxidiser,
landfill gas flare and landfill gas generator are provided in Tables 2.8 –
2.10 below.
Table 2.8 Limit Levels for Stack Emission of the Thermal
Oxidiser
|
Parameters |
Limit Level |
|
NO2 |
1.58
gs-1 |
|
CO |
0.53
gs-1 |
|
SO2 |
0.07
gs-1 |
|
Benzene |
3.01
x 10-2 gs-1 |
|
Vinyl
chloride |
2.23
x 10-3 gs-1 |
|
Gas
combustion temperature |
850oC
(minimum) |
|
Exhaust
gas exit temperature |
443K
(minimum) (a) |
|
Exhaust
gas velocity |
7.5
ms-1 (minimum) (a) |
|
Note: (a) Level
under full load condition. |
|
Table 2.9 Limit Levels for Stack Emission of the
Landfill Gas Flare
|
Parameters |
Limit Level |
|
NO2 |
0.97
gs-1 |
|
CO |
2.43
gs-1 |
|
SO2 |
0.22
gs-1 |
|
Benzene |
4.14
x 10-4 gs-1 |
|
Vinyl
chloride |
2.60
x 10-4 gs-1 |
|
Gas
combustion temperature |
815oC
(minimum) |
|
Exhaust
gas exit temperature |
923 K
(minimum) (a) |
|
Exhaust
gas velocity |
9.0 m
s-1 (minimum) (a) |
|
Note: (a) Level
under full load condition. |
|
Table 2.10
Limit Levels for Stack Emission of the Landfill Gas Generator
|
Parameters |
Limit Level |
|
NO2 |
1.91
gs-1 |
|
CO |
2.48
gs-1 |
|
SO2 |
0.528
gs-1 |
|
Benzene |
2.47
x 10-4 gs-1 |
|
Vinyl
chloride |
1.88
x 10-5 gs-1 |
|
Gas
combustion temperature |
450oC
(minimum) |
|
Exhaust
gas exit temperature |
723K
(minimum) (a) |
|
Exhaust
gas velocity |
30.0
ms-1 (minimum) (a) |
|
Note: (a) Level
under full load condition. |
|
Gas samples were collected from the centroid of the stack with stainless
steel sampling probe, into inert sample containers (i.e. Canister and Tedlar Bag) and transferred to ALS Technichem
(HK) Pty Ltd. (HOKLAS Registration No. 066) laboratory within 24 hours of
collection for direct analysis on a gas chromatography within 48 hours after
collection. The flue gas velocity of the gas stream at the exhaust of
thermal oxidiser was determined by S-Pitot tube during
the emission sampling.
The stack emission monitoring programme and monitoring locations are summarised
in Table 2.11 and illustrated in Figure 2.1b, respectively.
Table 2.11
Thermal Oxidiser, Landfill Gas Flare and Landfill Gas Generator Stack Emission
Monitoring Details
|
Monitoring Location |
Parameter |
Frequency |
Monitoring Date |
|
Stack
of Thermal Oxidiser |
Laboratory
analysis for · NO2 · CO · SO2 · Benzene · Vinyl
chloride In-situ
analysis for · Exhaust gas
velocity |
Monthly
for the first 12 months of operation and thereafter at quarterly intervals |
5 Jan
2026 |
|
Laboratory
analysis for · Non-methane
organic compounds CO |
Quarterly
for the 1st year of operation (a) |
- |
|
|
Laboratory
analysis for · Ammonia |
Quarterly |
- |
|
|
· Gas
combustion temperature · Exhaust
temperature · Exhaust gas
velocity (b) |
Continuously |
1 –
31 Jan 2026 |
|
|
Stack
of Landfill Gas Flare |
Laboratory
analysis for · NO2 · CO · SO2 · Benzene · Vinyl
chloride In-situ
analysis for · Exhaust gas
velocity |
Monthly
for the first 12 months of operation and thereafter at quarterly intervals (c) |
6 Jan
2026 |
|
Laboratory
analysis for · Non-methane
organic compounds CO |
Quarterly
for the 1st year of operation (a) |
- |
|
|
· Gas
combustion temperature ·
Exhaust temperature ·
Exhaust gas velocity (b) |
Continuously |
1 –
31 Jan 2026 |
|
Monitoring Location |
Parameter |
Frequency |
Monitoring Date |
|
|
|||
|
Stack
of Landfill Gas Generator |
Laboratory
analysis for · NO2 · CO · SO2 · Benzene · Vinyl
chloride In-situ
analysis for · Exhaust gas
velocity |
Monthly
for the first 12 months of operation and thereafter at quarterly intervals (d) |
- |
|
Laboratory
analysis for · Non-methane
organic compounds |
Termination
of monitoring (d) |
- |
|
|
· Exhaust
temperature · Exhaust gas
velocity (b) |
Continuously |
1 –
31 Jan 2026 |
|
|
Notes: (a) The monitoring results are
being reviewed to determine if monitoring of this parameter for the thermal
oxidise and landfill gas flare can be terminated upon agreement by the EIAO
Authority, IEC and Project Proponent. (b)
The
exhaust gas velocity is calculated based on the cross-section area of the
stack and continuous monitored gas flow and combustion temperature data. (c) Reduction of
monitoring frequency for the landfill gas flare will be subject to the
monitoring results to demonstrate environmentally acceptable performance. (d) The stack emission monitoring
frequency of the landfill gas generator was reduced from monthly to quarterly
interval, and the monitoring of non-methane organic compounds was terminated
upon agreement by the EIAO Authority, IEC and Project Proponent on 30 July
2025, effective from August 2025 onwards. |
|||
The
schedule for thermal oxidiser,
landfill gas flare and landfill gas generator stack emission monitoring during
the reporting period is provided in Annex C.
The thermal
oxidiser,
landfill gas flare and landfill gas generator stack emission monitoring results
and detailed continuous monitoring results are summarised
in Tables 2.12 - 2.14 and provided in Annex D7, respectively.
Table 2.12
Summary of Thermal Oxidiser Stack Emission Monitoring in the Reporting Period
|
Parameters |
Monitoring Results (Range in Bracket) |
Limit Level |
|
NO2 |
1.03
gs-1 |
1.58
gs-1 |
|
CO |
0.04
gs-1 |
0.53
gs-1 |
|
SO2 |
<0.01
gs-1 |
0.07
gs-1 |
|
Benzene |
<2.0
x 10-4 gs-1 |
3.01
x 10-2 gs-1 |
|
Vinyl
chloride |
<1.6
x 10-4 gs-1 |
2.23
x 10-3 gs-1 |
|
Gas
combustion temperature |
900oC
(886oC – 907oC) |
850oC
(minimum) |
|
Exhaust
gas exit temperature |
1,177K
(1,139K – 1,195K) |
443K
(minimum) (a) |
|
Exhaust
gas velocity |
10.9
ms-1 (b) |
7.5
ms-1 (minimum) (a) |
|
Notes: (a)
Level under full load condition. (b) The exhaust gas velocity was
calculated based on the cross-section area of the stack and the gas flow and
combustion temperature data measured during the stack emission monitoring. |
||
Table 2.13
Summary of Landfill Gas Flare Stack Emission Monitoring in the Reporting Period
|
Parameters |
Monitoring Results (Range in Bracket) |
Limit Level |
|
NO2 |
0.03
gs-1 |
0.97
gs-1 |
|
CO |
0.31
gs-1 |
2.43
gs-1 |
|
SO2 |
<0.01
gs-1 |
0.22
gs-1 |
|
Benzene |
<1.33
x 10-4 gs-1 |
4.14
x 10-4 gs-1 |
|
Vinyl
chloride |
<1.07
x 10-4 gs-1 |
2.60
x 10-4 gs-1 |
|
Gas
combustion temperature |
Flare 1: 906oC
(882oC – 935oC) Flare
2: 931oC (900oC – 957oC) |
815oC
(minimum) |
|
Exhaust gas
exit temperature |
Flare 1: 1,052K (1,021K – 1,104K) Flare 2:
1,079K (1,030K – 1,121K) |
923 K
(minimum) (a) |
|
Exhaust gas
velocity |
8.7
ms-1 (b) |
9.0 m
s-1 (minimum) (a) |
|
Notes: (a)
Level under full load condition. (b) The exhaust gas velocity was
calculated based on the cross-section area of the stack and the gas flow and
combustion temperature data measured during the stack emission monitoring. |
||
Table 2.14
Summary of Landfill Gas Generator Stack Emission Monitoring in the Reporting
Period
|
Parameters |
Monitoring Results (Range in Bracket) |
Limit Level |
|
NO2 |
N/A (b) |
1.91
gs-1 |
|
CO |
N/A (b) |
2.48
gs-1 |
|
SO2 |
N/A (b) |
0.528
gs-1 |
|
Benzene |
N/A (b) |
2.47
x 10-4 gs-1 |
|
Vinyl
chloride |
N/A (b) |
1.88
x 10-5 gs-1 |
|
Exhaust
gas exit temperature |
ENGA: 856K (843K – 864K) ENGB: 861K
(842K – 877K) |
723K
(minimum) (a) |
|
Exhaust
gas velocity |
N/A (b) |
30.0
ms-1 (minimum) (a) |
|
Notes: (a)
Level under full load condition. (b) As stack emission monitoring
frequency of the landfill gas generator was reduced from monthly to quarterly
interval upon agreement by the EIAO Authority, IEC and Project Proponent,
there is no monitoring results in this reporting period. |
||
No Action and Limit Level exceedance was recorded for thermal oxidiser, landfill
gas flare and landfill gas generator stack emission monitoring in the reporting
period. No action is
thus required to be undertaken in accordance with the Event and Action Plan
presented in Annex D3.
According
to the updated EM&A Manual of the Project, noise levels at noise monitoring
location NM1 and NM2 should be monitored during the first 3 years of operation
and the next 3 years of operation until the completion of the restoration phase, respectively. Impact noise monitoring was
conducted weekly at the monitoring location (i.e. at NM1 before 20 November
2024; and at NM2 from 20 November 2024) to obtain one set of 30-minute
measurements between 07:00 and 19:00 hours on normal weekdays.
The Action
and Limit Levels for operational noise of the Project are provided in Table
2.15 below.
Table 2.15
Action and Limit Levels for Operational Noise
|
Time Period |
Action Level (a) |
Limit Level (b) |
|
07:00 – 19:00 hrs on all
days |
When one documented complaint is received from any
one of the noise sensitive receivers (NSRs) or 75 dB(A) recorded at the monitoring station |
65 dB(A) at NSRs (c) |
|
19:00 – 23:00 hrs on all
days |
65 dB(A) at NSRs (c) |
|
|
23:00 – 07:00 hrs on all days |
55 dB(A) at NSRs (c) |
|
|
Notes: (a) 75dB(A)
along and at about 100m from the SENTX site boundary was set as the Action
Level. (b) Limits
specified in the GW-TM and IND-TM for construction and operational noise,
respectively. (c) Limit Level only apply to operational noise without road traffic and
construction activities noise. |
||
Noise monitoring was performed by ALS Technichem
(HK) Pty Ltd. (HOKLAS Registration No. 066) using sound level meter at the
designated monitoring station NM2 (see Figure 2.1b) in accordance with the requirements
stipulated in the updated EM&A Manual. Acoustic
calibrator was deployed to check the sound level meter at a known sound
pressure level. Details of the deployed equipment are provided in Table 2.16.
Copies of the calibration certificates for the equipment are presented in Annex E1.
Table 2.16
Noise Monitoring Details
|
Monitoring Station |
Location |
Parameter |
Frequency and Duration |
Monitoring Dates |
Equipment |
|
NM2 |
SENTX
Site Boundary (East) |
Leq
(30 min) measurement between 07:00 and 19:00 hours on normal
weekdays (Monday
to Saturday) |
Once
per week for 30 mins during operation of the Project |
6,
12, 22, 28 Jan 2026 |
Sound Level Meter: Rion NL-52 (S/N: 00331806) Acoustic Calibrator: CAL200 (S/N: 11333) |
The
schedule for noise monitoring during the reporting period is provided in Annex C.
A total of
5 impact noise monitoring events were scheduled during the reporting period.
Results for noise monitoring are summarised in Table
2.17. The monitoring results and the graphical presentation of
the data are provided in Annex
E2.
Table 2.17
Summary of Operation Noise Monitoring Results in the Reporting Period
|
|
Measured Noise Level Leq (30 min), dB(A) |
||
|
Monitoring Station |
Average |
Range |
Action and Limit Level |
|
NM2 |
46.0 |
40.4
– 52.3 |
75 |
Major noise sources identified during the noise monitoring included
noise from insects. No Action and Limit Levels exceedance was recorded for
operation noise monitoring in the reporting period. No action is thus
required to be undertaken in accordance with the Event and Action Plan
presented in Annex E3.
According
to the updated EM&A Manual of the Project, impact surface water quality
monitoring was carried out at the three designated surface water discharge
points (i.e. DP3, DP4 and DP6) at monthly intervals during operation/
restoration phase to ensure that the SENTX will not cause adverse water quality
impact.
The parameters as listed in Table 2.19 were determined by
ALS Technichem (HK) Pty Ltd. (HOKLAS Registration No.
066).
The Limit
Levels of the surface water quality impact monitoring are provided in Table
2.18.
Table 2.18
Limit Levels for Surface Water Quality
|
Parameters |
Limit Level |
|
DP3 |
|
|
Ammoniacal-nitrogen |
>
0.5 mg/L |
|
COD |
>
80 mg/L |
|
SS |
>
30 mg/L |
|
DP4
& DP6 |
|
|
Ammoniacal-nitrogen |
>
7.1 mg/L |
|
COD |
>
30 mg/L |
|
SS |
>
20 mg/L |
|
Note: The
limit levels specified for other parameters in Table 10a of the
Technical Memorandum Standards for Effluents Discharged into Drainage and
Sewerage Systems, Inland and Coastal Waters shall also be followed. |
|
The locations
of the monitoring stations for the Project are shown in Figure 2.1b. All in situ monitoring instruments were checked, calibrated and certified by a laboratory accredited under
HOKLAS or other international accreditation scheme before use, and subsequently
re-calibrated at 3 monthly intervals throughout all stages of the surface water
quality monitoring programme. Calibration for a
DO meter was carried out before measurement according to the instruction manual
of the equipment model. Details of the equipment used in the impact surface
water quality monitoring works are provided in Table 2.19. Copies of the
calibration certificates for the equipment are presented in Annex F1.
Table 2.19
Impact Surface Water Quality Monitoring Details
|
Monitoring Station |
Location |
Frequency |
Monitoring Dates |
Parameter |
Equipment |
|
|
DP3 |
Surface water discharge point DP3 |
Monthly |
12 Jan 2026 |
·
pH
·
Electrical
conductivity (EC) ·
DO
·
SS
·
COD ·
BOD5
·
TOC
·
Ammoniacal–nitrogen
·
Nitrate-nitrogen ·
Nitrite–nitrogen ·
TKN ·
TN ·
Phosphate ·
Sulphate ·
Sulphide ·
Carbonate ·
Oil
& Grease |
·
Bicarbonate ·
Chloride
·
Sodium
·
Potassium
·
Calcium ·
Magnesium ·
Nickel ·
Manganese ·
Chromium
·
Cadmium
·
Copper ·
Lead ·
Iron ·
Zinc ·
Mercury
·
Boron |
Horiba
U-52G (S/N: NVAE08GT) |
|
DP4 |
Surface water discharge point DP4 |
|||||
|
DP6 |
Surface water discharge point DP6 |
|||||
The
schedule for surface water quality monitoring during the reporting period is
provided in Annex C.
One
monitoring event for impact surface water quality monitoring was scheduled at
all designated monitoring stations during the reporting period. However,
sampling could not be carried out on 12 January 2026. Details of impact water
quality monitoring event are provided in Annex F2.
All surface
water quality monitoring results were below the Action and Limit Levels in the
reporting period. No action is thus required to be undertaken in accordance
with the event and action plan presented in Annex F3.
According
to the updated EM&A Manual, continuous monitoring of leachate level and
monthly monitoring of effluent quality were carried out during the operation/
restoration phase.
Reduction
of effluent monitoring frequency (dry season) (from daily to monthly) was
approved by EPD on 22 March 2022. Monthly effluent quality monitoring
(dry season) shall be conducted from 23 March 2022. The reduction of
effluent monitoring frequency (wet season) (from daily to monthly) was approved
by EPD on 2 August 2022. Monthly effluent quality monitoring (wet season)
shall be conducted from 3 August 2022.
Temperature,
pH and volume of the effluent discharged from the leachate treatment plant were
measured in-situ whereas the parameters as listed in Table 2.21 were
determined by ALS Technichem (HK) Pty Ltd. (HOKLAS
Registration No. 066).
The Limit
Levels of the leachate monitoring are provided in Table 2.20.
Table 2.20
Limit Levels for Leachate Levels and Effluent Quality
|
Parameters |
Limit Level |
|
Leachate
Levels |
|
|
Leachate
levels above the basal liner |
1 m
above the primary liner of the leachate containment system |
|
Effluent Quality (a) |
|
|
Temperature |
> 43 °C |
|
pH Value |
6 – 10 |
|
Volume Discharged |
>2,000 m³ |
|
Suspended Solids (SS) |
> 800 mg/L |
|
Alkalinity |
N/A |
|
Ammoniacal-nitrogen |
N/A |
|
Chloride |
N/A |
|
Nitrite-nitrogen |
N/A |
|
Phosphate |
> 25 mg/L |
|
Sulphate |
> 800 mg/L |
|
Total Nitrogen |
N/A |
|
Nitrate-nitrogen |
N/A |
|
Total Inorganic Nitrogen (b) |
> 100 mg/L |
|
Biochemical Oxygen Demand (BOD) |
> 800 mg/L |
|
Chemical Oxygen Demand (COD) |
> 2,000 mg/L |
|
Oil & Grease |
> 20 mg/L |
|
Total Organic Carbon (TOC) |
N/A |
|
Boron |
> 7,000 µg/L |
|
Calcium |
N/A |
|
Iron |
> 5 mg/L |
|
Magnesium |
N/A |
|
Potassium |
N/A |
|
Cadmium |
> 1 µg/L |
|
Chromium |
> 300 µg/L |
|
Copper |
> 1,000 µg/L |
|
Nickel |
> 700 µg/L |
|
Zinc |
> 700 µg/L |
|
Note: (a) The limit level for leachate effluent was determined
in accordance with the discharge licence issued under the Water Pollution
Control Ordinance (WPCO) for Stream A. (b) Total Inorganic Nitrogen include
Ammoniacal-nitrogen, Nitrite-nitrogen and Nitrate-nitrogen. |
|
All in situ monitoring
instruments were checked, calibrated and certified by a laboratory accredited
under HOKLAS or other international accreditation scheme before use, and
subsequently
re-calibrated at 3 monthly intervals throughout all stages of the leachate
quality monitoring programme. Details of the
equipment used are provided in Table 2.21. Copies of the calibration
certificates for the equipment are presented in Annex F4.
Table 2.21
Leachate Levels and Effluent Quality Monitoring Details
|
Location |
Frequency |
Parameter |
Monitoring Dates |
Equipment |
|
Leachate levels above the basal liner |
Continuous |
Leachate
Levels |
1 –
31 Jan 2026 |
Pairs
of pressure transducers |
|
Effluent discharged from LTP |
Daily
for the first 3 months upon full operation of the LTP at wet season (Apr to
Sep) and dry season (Oct to Mar), respectively and reduce to monthly
thereafter subject to the monitoring results of the first 3 months for each
season and agreement with the EIAO Authority, IEC and IC. (a) |
On-site Measurements: · Volume · pH · Temperature Laboratory analysis: · Suspended
Solids · COD · BOD5
· TOC · Ammoniacal–nitrogen
· Nitrate-nitrogen · Nitrite–nitrogen · Total
Nitrogen · Sulphate · Phosphate · Oil &
Grease · Alkalinity · Chloride · Calcium · Potassium · Magnesium · Iron · Zinc · Copper · Chromium · Nickel · Cadmium · Boron |
9 Jan
2026 |
Lutron
PH-208 (S/N: TF31039) |
|
Note: (a) Reduction
of monitoring frequency will be subject to the monitoring results to
demonstrate environmentally acceptable performance. |
||||
The
schedule for leachate monitoring during the reporting period is provided in Annex C.
The
leachate levels and effluent quality monitoring results are summarised
in Table 2.22 and Table 2.23, respectively. The detailed
monitoring results are provided in Annex F5 and Annex F6, respectively.
Table 2.22
Summary of Leachate Levels in the Reporting Period
|
Monitoring Location |
Average Leachate Head Levels (cm) (Range in Bracket) |
Limit Level (cm) |
|
Pump
Station No. 1X (Cell 1X) |
||
|
Meter
No. X-1 |
114
(102 – 137) |
>178 |
|
Meter
No. X-2 |
104
(91 – 119) |
|
|
Average |
109
(101 – 124) |
|
|
Pump
Station No. 2X (Cell 2X) |
||
|
Meter
No. X-3 |
105
(91 – 120) |
>180 |
|
Meter
No. X-4 |
99
(82 – 131) |
|
|
Average |
102
(87 – 124) |
|
|
Pump
Station No. 3X (Cell 3X) |
||
|
Meter
No. X-5 |
105
(75 – 117) |
>
175 |
|
Meter
No. X-6 |
89
(75 – 106) |
|
|
Average |
97
(75 – 109) |
|
|
Pump
Station No. 4X (Cell 4X) |
||
|
Meter
No. X-7 |
106
(100 – 109) |
>
186 |
|
Meter
No. X-8 |
116
(94 – 120) |
|
|
Average |
111
(99 – 115) |
|
Table 2.23
Summary of Effluent Quality Monitoring Results in the Reporting Period
|
Parameters |
Monitoring Results |
Limit Level |
|
|
Effluent
Discharged from LTP |
|
||
|
Temperature |
°C |
23.4 |
>
43 °C |
|
pH
Value |
pH
unit |
8.1 |
6 –
10 |
|
Volume
Discharged |
m³ |
1088 |
>2,000
m³ |
|
Suspended
Solids (SS) |
mg/L |
31.1 |
>
800 mg/L |
|
Phosphate |
mg/L |
2.7 |
>
25 mg/L |
|
Sulphate |
mg/L |
146 |
>
800 mg/L |
|
Total
Inorganic Nitrogen (a) |
mg/L |
36.05 |
>
100 mg/L |
|
BOD |
mg/L |
10 |
>
800 mg/L |
|
COD |
mg/L |
976 |
>
2,000 mg/L |
|
Oil
& Grease |
mg/L |
<5 |
>
20 mg/L |
|
Boron |
µg/L |
5300 |
>
7,000 µg/L |
|
Iron |
mg/L |
1.21 |
>
5 mg/L |
|
Cadmium |
µg/L |
<1.0 |
>
1 µg/L |
|
Chromium |
µg/L |
94 |
>
300 µg/L |
|
Copper |
µg/L |
<10 |
>
1,000 µg/L |
|
Nickel |
µg/L |
89 |
>
700 µg/L |
|
Zinc |
µg/L |
10 |
>
700 µg/L |
|
Note: (a) Total
Inorganic Nitrogen include Ammoniacal-nitrogen,
Nitrite-nitrogen and Nitrate-nitrogen. |
|||
All leachate levels and effluent quality monitoring results were below
the Limit Levels in the reporting period. No action is thus required to be
undertaken in accordance with the Event and Action Plan presented in Annex F3.
According
to the updated EM&A Manual of the Project with incorporation of the
proposed updates under the Amendment Summary approved by EPD on 15 June 2020,
groundwater monitoring was carried out at 14 perimeter groundwater monitoring
wells (including 3 up-gradient wells and 11 down-gradient wells) (i.e. MWX-1 to
MWX-14) to monitor the groundwater quality and level of the perimeter
groundwater monitoring wells at monthly interval.
The Limit
Levels for groundwater quality is provided in Table
2.24 below.
Table 2.24
Limit Levels for Groundwater Quality
|
Location |
Limit Levels |
|
|
Ammoniacal-nitrogen (mg L-1) |
COD (mg L-1) |
|
|
MWX-1 |
5.00 |
30 |
|
MWX-2 |
5.00 |
30 |
|
MWX-3 |
5.00 |
30 |
|
MWX-4 |
7.63 |
36 |
|
MWX-5 |
5.00 |
30 |
|
MWX-6 |
5.00 |
46 |
|
MWX-7 |
6.55 |
36 |
|
MWX-8 |
15.85 |
50 |
|
MWX-9 |
7.30 |
71 |
|
MWX-10 |
5.00 |
30 |
|
MWX-11 |
5.00 |
30 |
|
MWX-12 |
5.00 |
30 |
|
MWX-13 |
5.00 |
30 |
|
MWX-14 |
5.00 |
30 |
A bladder pump with Teflon sampling tube and adjustable discharge rates
was used for purging and taking of groundwater sample from the monitoring wells. Filtered groundwater
samples were collected by connecting a disposable in-line filter system to the
tubing of the sampling pump, prior to storage and analysis by ALS Technichem (HK) Pty Ltd. (HOKLAS Registration No.
066). A portable dip meter with 5mm accuracy was used for measurement of
groundwater level at each well. The dip meter has an audio indicator of
the water level and was checked before use.
The measurements of pH and electrical
conductivity (EC) were undertaken in situ. In situ
monitoring instruments in compliance with the specifications listed under
Section 4.3.2 of the updated EM&A Manual were used to undertake the groundwater quality monitoring for the Project.
Details of the equipment used and the monitoring
locations are summarised in Table 2.25 and
illustrated in Figure 2.1b,
respectively. Copies of the calibration certificates for the
equipment are presented in Annex
F7.
Table 2.25
groundwater monitoring details
|
Location |
Frequency |
Parameter |
Monitoring Dates |
Equipment |
|
|
All
groundwater monitoring wells (MWX-1 to MWX-14) |
Monthly |
·
Water level ·
pH ·
EC ·
COD ·
BOD5 ·
TOC ·
Ammoniacal–nitrogen ·
Nitrate-nitrogen ·
Nitrite–nitrogen ·
TKN ·
TN ·
Sulphate ·
Sulphide ·
Carbonate ·
Bicarbonate ·
Phosphate |
·
Chloride ·
Sodium ·
Potassium ·
Calcium ·
Magnesium ·
Nickel ·
Manganese ·
Chromium ·
Cadmium ·
Copper ·
Lead ·
Iron ·
Zinc ·
Mercury ·
Boron |
12
Jan 2026 |
Horiba U-52G
(S/N: NVAE08GT) |
The
schedule for groundwater quality monitoring during the reporting period is
provided in Annex C.
The
groundwater quality monitoring results and detailed monitoring results are summarised in Table 2.26 and provided in Annex F8, respectively.
Table 2.26
Summary of Groundwater Monitoring Results in the Reporting Period
|
Location |
Ammoniacal-nitrogen (mg L-1) |
COD (mg L-1) |
||
|
Monitoring Results |
Limit Levels |
Monitoring Results |
Limit Levels |
|
|
MWX-1 |
0.2 |
5.00 |
5 |
30 |
|
MWX-2 |
0.15 |
5.00 |
19 |
30 |
|
MWX-3 |
1.5 |
5.00 |
18 |
30 |
|
MWX-4 |
0.53 |
7.63 |
16 |
36 |
|
MWX-5 |
2.22 |
5.00 |
26 |
30 |
|
MWX-6 |
4.58 |
5.00 |
43 |
46 |
|
MWX-7 |
2.48 |
6.55 |
36 |
36 |
|
MWX-8 |
15 |
15.85 |
36 |
50 |
|
MWX-9 |
N/A (a) |
7.30 |
N/A (a) |
71 |
|
MWX-10 |
N/A (b) |
5.00 |
N/A (b) |
30 |
|
MWX-11 |
N/A (c) |
5.00 |
N/A (c) |
30 |
|
MWX-12 |
0.02 |
5.00 |
<2 |
30 |
|
MWX-13 |
N/A (b) |
5.00 |
N/A (b) |
30 |
|
MWX-14 |
0.01 |
5.00 |
3 |
30 |
|
Note: (a)
Monitoring well MWX-9 is not accessible due to the
construction works. (b)
Monitoring well MWX-10 and MWX-13 are under maintenance. (c) Monitoring
well MWX-11 is not accessible due to the safety considerations. |
||||
All the
groundwater monitoring results were below the Limit Levels in the reporting
period. No action is thus required to be undertaken in accordance with the
Event and Action Plan presented in Annex F3.
According
to the updated EM&A Manual of the Project, landfill gas monitoring was
carried out at the perimeter of the waste boundary (monitoring wells), area
between the SENTX Site boundary and the waste boundary (surface emission),
occupied on-site building, service voids, utilities pit and manholes in the
vicinity of the SENTX (build-up of landfill gas) during the
operation/restoration phase.
The Limit
Levels for landfill gas monitoring is provided in Table
2.27 below.
Table 2.27
Limit Levels for Landfill Gas Constituents
|
Parameters |
Monitoring Location |
Limit Level (% (v/v)) |
|
|
Perimeter
Landfill Gas Monitoring Wells (a)
|
|||
|
Methane
& Carbon Dioxide |
|
Methane |
Carbon
Dioxide |
|
LFG1 |
1.0 |
3.2 |
|
|
LFG2 |
1.0 |
4.3 |
|
|
LFG3 |
1.0 |
6.3 |
|
|
LFG4 |
1.0 |
7.0 |
|
|
LFG5 |
1.0 |
3.4 |
|
|
LFG6 |
1.0 |
9.1 |
|
|
LFG7 |
1.0 |
1.5 |
|
|
LFG8 |
12.6 |
2.4 |
|
|
LFG9 |
2.5 |
1.7 |
|
|
LFG10 |
3.5 |
1.6 |
|
|
LFG11 |
3.0 |
2.0 |
|
|
LFG12 |
13.2 |
1.5 |
|
|
LFG13 |
22.5 |
2.7 |
|
|
LFG14 |
5.2 |
1.8 |
|
|
LFG15 |
18.2 |
2.0 |
|
|
LFG16 |
1.0 |
2.0 |
|
|
LFG17 |
17.8 |
2.4 |
|
|
LFG18 |
2.3 |
2.1 |
|
|
LFG19 |
6.3 |
3.1 |
|
|
LFG20 |
1.0 |
4.6 |
|
|
LFG21 |
1.0 |
4.8 |
|
|
LFG22 |
1.0 |
4.0 |
|
|
LFG23 |
1.0 |
10.3 |
|
|
LFG24 |
1.0 |
4.7 |
|
|
GP1 |
1.0 |
10.6 |
|
|
GP2
(shallow) |
1.0 |
11.4 |
|
|
GP2
(deep) |
1.0 |
10.4 |
|
|
GP3
(shallow) |
1.0 |
6.9 |
|
|
GP3
(deep) |
1.0 |
5.6 |
|
|
GP4
(shallow) |
1.0 |
11.6 |
|
|
GP4
(deep) |
1.0 |
7.7 |
|
|
GP5
(shallow) |
1.0 |
10.8 |
|
|
GP5
(deep) |
1.0 |
7.5 |
|
|
GP6 |
1.0 |
8.4 |
|
|
GP7 |
1.0 |
4.5 |
|
|
GP12 |
1.0 |
2.3 |
|
|
GP15 |
1.0 |
2.2 |
|
|
P7 |
1.0 |
2.5 |
|
|
P8 |
1.0 |
1.7 |
|
|
P9 |
1.0 |
2.7 |
|
|
Service
Voids, Utilities Pits and Manholes |
|||
|
Methane
(or flammable gas) |
Service
voids, utilities pits and manholes |
1% by
volume |
|
|
Permanent
Gas Monitoring System |
|||
|
Methane
(or flammable gas) |
Permanent
Gas Monitoring System |
1% by
volume (20% LEL) |
|
|
Area
Between the SENTX Site Boundary and Waste Boundary (Surface Emission) |
|||
|
Flammable
gas |
Area
between SENTX site boundary and waste boundary |
30
ppm |
|
|
Note:
(a)
Limit Levels established based on the pre-operation phase
baseline and additional landfill gas monitoring results in the Pre-operation
Baseline Monitoring Report. |
|||
Gas analysers in compliance with the
specifications listed under Section 5.4.1 of the updated EM&A Manual were
used to monitor the gas parameters at the landfill gas monitoring wells,
service voids, utilities pits and manholes. The gas analyser
was calibrated by a laboratory accredited under HOKLAS at yearly intervals and
checked before use to ensure the validity and accuracy of the results. A
portable dip meter was used to monitor the water level in the monitoring wells.
Permanent
gas monitoring systems with pre-set alarm levels for methane at 20% lower
explosive limit (LEL, equivalent to 1% methane gas (v/v)) were installed and
operated in all occupied on-site buildings at SENTX. A central control
panel is equipped to alert site personnel when the gas concentration at any
detector reaches the alarm level.
The
equipment used in the landfill gas monitoring programme
is summarised in Table 2.28. The
landfill gas monitoring locations for perimeter landfill gas monitoring wells
and service voids, utilities and manholes along the Site boundary are
illustrated in Figure 2.3
and Annex G1, respectively.
Copies of the calibration certificates for the equipment are presented in Annex G2.
Table 2.28
Landfill Gas Monitoring Details
|
Monitoring Location |
Frequency |
Parameter |
Monitoring Dates |
Equipment |
|
Perimeter
landfill gas monitoring wells (LFG1 to LFG24, P7 to P9, GP1 to GP7, GP12 and
GP15) |
Monthly |
·
Methane ·
Carbon dioxide ·
Oxygen ·
Atmospheric pressure |
14
Jan 2026 |
GA5000
(S/N: G508090) |
|
Service
voids, utilities and manholes along the Site boundary and within the SENTX
Site (UU1 to UU28) |
Monthly |
·
Methane ·
Carbon dioxide ·
Oxygen |
14
Jan 2026 |
GA5000
(S/N: G508090) |
|
Permanent
gas monitoring system in all occupied on-site buildings |
Continuous |
Methane
(or flammable gas) by permanent gas monitoring system |
1 –
31 Jan 2026 |
Permanent
gas monitoring system |
|
Areas
between the SENTX Site boundary and the waste boundary and location of
vegetation stress |
Quarterly |
Flammable
gas emitted from the ground surface |
- |
- |
|
Bulk
gas sampling at least 2 of the perimeters LFG monitoring wells |
Quarterly |
·
Methane ·
Carbon dioxide ·
Oxygen ·
Nitrogen ·
Carbon monoxide ·
Other flammable gas |
- |
Gas
sampling pump and Tedlar bags |
The
schedule for landfill gas monitoring during the reporting period is provided in
Annex C.
The
landfill gas monitoring results are summarised and
provided in Tables 2.29 - 2.30 and Annex G3, respectively.
Table 2.29 Summary of Landfill Gas Monitoring
Results at Perimeter LFG Monitoring Wells in the Reporting Period
|
Location |
Methane (% (v/v)) |
Carbon Dioxide (% (v/v)) |
||
|
Monitoring Results |
Limit Levels (a)
|
Monitoring Results |
Limit Levels (a) |
|
|
LFG1 |
0.0 |
1.0 |
0.1 |
3.2 |
|
LFG2 |
0.0 |
1.0 |
0.1 |
4.3 |
|
LFG3 |
0.0 |
1.0 |
1.1 |
6.3 |
|
LFG4 |
0.0 |
1.0 |
0.3 |
7.0 |
|
LFG5 |
0.0 |
1.0 |
0.4 |
3.4 |
|
LFG6 |
0.0 |
1.0 |
1.3 |
9.1 |
|
LFG7 |
0.0 |
1.0 |
0.1 |
1.5 |
|
LFG8 |
0.0 |
12.6 |
0.8 |
2.4 |
|
LFG9 |
0.0 |
2.5 |
0.3 |
1.7 |
|
LFG10 |
0.0 |
3.5 |
0.3 |
1.6 |
|
LFG11 |
0.0 |
3.0 |
0.5 |
2.0 |
|
LFG12 |
0.0 |
13.2 |
0.2 |
1.5 |
|
LFG13 |
9.9 |
22.5 |
1.1 |
2.7 |
|
LFG14 |
0.0 |
5.2 |
0.1 |
1.8 |
|
LFG15 |
0.0 |
18.2 |
0.2 |
2.0 |
|
LFG16
(b) |
N/A |
1.0 |
N/A |
2.0 |
|
LFG17
(b) |
N/A |
17.8 |
N/A |
2.4 |
|
LFG18 |
0.0 |
2.3 |
0.5 |
2.1 |
|
LFG19 |
0.0 |
6.3 |
0.5 |
3.1 |
|
LFG20 |
0.0 |
1.0 |
0.2 |
4.6 |
|
LFG21
(c) |
N/A |
1.0 |
N/A |
4.8 |
|
LFG22
(c) |
N/A |
1.0 |
N/A |
4.0 |
|
LFG23 |
0.0 |
1.0 |
0.1 |
10.3 |
|
LFG24 |
0.0 |
1.0 |
0.1 |
4.7 |
|
GP1 |
0.0 |
1.0 |
5.5 |
10.6 |
|
GP2
(shallow) |
0.0 |
1.0 |
0.1 |
11.4 |
|
GP2
(deep) |
0.0 |
1.0 |
0.3 |
10.4 |
|
GP3
(shallow) (c) |
N/A |
1.0 |
N/A |
6.9 |
|
GP3
(deep) (c) |
N/A |
1.0 |
N/A |
5.6 |
|
GP4
(shallow) (c) |
N/A |
1.0 |
N/A |
11.6 |
|
GP4
(deep) (c) |
N/A |
1.0 |
N/A |
7.7 |
|
GP5
(shallow) |
0.5 |
1.0 |
0.5 |
10.8 |
|
GP5
(deep) |
0.4 |
1.0 |
0.4 |
7.5 |
|
GP6 (c) |
N/A |
1.0 |
N/A |
8.4 |
|
GP7 |
0.0 |
1.0 |
0.1 |
4.5 |
|
GP12 |
0.0 |
1.0 |
0.1 |
2.3 |
|
GP15 |
0.0 |
1.0 |
0.1 |
2.2 |
|
P7 |
0.0 |
1.0 |
0.1 |
2.5 |
|
P8 |
0.0 |
1.0 |
0.1 |
1.7 |
|
P9 |
0.0 |
1.0 |
0.1 |
2.7 |
|
Notes: (a) Limit Levels established based on the
pre-operation phase baseline and additional landfill gas monitoring results
in the Pre-operation Baseline Monitoring Report. (b) Monitoring well LFG16 and LFG17 are not
accessible due to the construction work. (c) Monitoring well LFG21, LFG22, GP3, GP4 and
GP6 are not accessible due to the safety considerations. |
||||
Table 2.30 Summary of Landfill Gas Monitoring
Results at Service Voids, Utilities Pits and Manholes in the Reporting Period
|
Location |
Methane (% (v/v)) |
|
|
Monitoring Results |
Limit Levels |
|
|
UU01 |
0.0 |
1.0 |
|
UU02 |
0.0 |
1.0 |
|
UU03 |
Voided
due to latest site programme and on-going operation
work |
1.0 |
|
UU04 |
Unmeasurable
due to being covered by silt |
1.0 |
|
UU05 |
0.0 |
1.0 |
|
UU06 |
0.0 |
1.0 |
|
UU07 |
0.0 |
1.0 |
|
UU08 |
0.0 |
1.0 |
|
UU09 |
0.0 |
1.0 |
|
UU10 |
0.0 |
1.0 |
|
UU11 |
0.0 |
1.0 |
|
UU12 |
Voided
due to latest site programme and on-going operation
work |
1.0 |
|
UU13 |
0.0 |
1.0 |
|
UU14 |
0.0 |
1.0 |
|
UU15 |
Unmeasurable
due to being covered by silt |
1.0 |
|
UU16 |
0.0 |
1.0 |
|
UU17 |
Voided
due to latest site programme and on-going operation
work |
1.0 |
|
UU18 |
Voided
due to latest site programme and on-going operation
work |
1.0 |
|
UU19 |
Voided
due to latest site programme and on-going operation
work |
1.0 |
|
UU20 |
0.0 |
1.0 |
|
UU21 |
0.0 |
1.0 |
|
UU22 |
0.0 |
1.0 |
|
UU23 |
0.0 |
1.0 |
|
UU24 |
0.0 |
1.0 |
|
UU25 |
0.0 |
1.0 |
|
UU26 |
0.0 |
1.0 |
|
UU27 |
0.0 |
1.0 |
|
UU28 |
0.0 |
1.0 |
The alarm of the permanent gas monitoring systems with pre-set levels
for methane at 20% lower explosive limit (LEL, equivalent to 1% methane gas
(v/v)) was not triggered at all occupied on-site buildings at SENTX in January
2026.
All the landfill gas monitoring results were below the Limit Levels in
the reporting period. No action is thus required to be undertaken in
accordance with the Event and Action Plan presented in Annex G4.
According
to the updated EM&A Manual of the Project, the monthly landscape and visual
audit was conducted on 29 January 2026 to monitor the implementation of
the landscape and visual mitigation measures during operation/ restoration
phase.
All
relevant environmental mitigation measures listed in the approved EIA Report
and the updated EM&A Manual and their implementation status are summarized
in Annex B.
The
Contractor has implemented environmental mitigation measures as stated in the
approved EIA Report and the EM&A Manual.
Regarding
the landscape and visual audit, the Contractor was reminded to maintain the
advance screen planting work regularly to ensure effective screening of views
of project works from the High Junk Peak Trail.
Site
inspections were carried out on a weekly basis with the Contractor, IEC and EPD
to monitor the implementation of proper environmental pollution control and
mitigation measures under the Project. In the reporting period, 4 site
inspections were carried out on 8, 14, 22 and 29 January 2026.
Key observations during the site inspections
are summarised in Table 2.31.
Table
2.31 Key Observations Identified during the Site Inspection in this Reporting
Month
|
Inspection Date |
Environmental
Observations and Recommendations |
|
8 January 2026 |
·
The Contractor shall
remove the plants growing at the X10 channel near Pump House No.3 to ensure
it is properly functioning at all times. |
|
14 January 2026 |
·
The
Contractor shall remove the general refuse accumulated at X10 channel near
Pump House No.2 to ensure it is functioning at all times. ·
The Contractor shall
pump out the stagnant water accumulated at the drainage channel of DP6. ·
The
Contractor shall clean up the oil spillage near DP4 and handle the cleanup
material as chemical waste. |
|
22 January 2026 |
·
The Contractor
shall remove the general refuse accumulated at DP3 sediment pit to ensure it
is functioning at all times. ·
The Contractor shall remove the general refuse and
plants growing at X10 channel near Pump House No.2 to ensure it is functioning at all times. |
|
29 January 2026 |
·
The Contractor shall remove the general refuse
accumulated at DP3 sediment pit to ensure it is functioning
at all times. |
The Contractor has rectified all the observations identified during
environmental site inspections in the reporting period. Key environmental
deficiencies identified and the corresponding rectification actions are
presented in Table 2.32.
Table 2.32
Summary of Environmental Deficiencies Identified and Corresponding
Rectification Actions
|
Deficiencies |
Rectifications
Implemented |
Proposed Additional
Control Measures |
|
Surface
Water |
||
|
Intercepting
channels & drainage system |
·
Reviewed drainage plan. |
·
Addition of channels. ·
Expedite the construction of permanent sediment trap
and discharge culverts. |
|
DP channels (design & regular
silt removal) |
·
Carried out regular maintenance and
cleaning of channels. ·
DP4 channel: Area near the channel was
paved with concrete and a bund was built. ·
DP6 channel: Gravel piles on the
channel were covered with concrete which serve as blocks for running water
and to divide the channel into several sections. A pump was placed in the
water zone in the upstream section to pump water to the Wetsep
for treatment prior to the discharge to the last section before the weir
plate. ·
DP6: Pipes through the gravel piles
between different channel sections were covered with geotextiles to block
debris and silt. |
N.A. |
|
Stockpiles & exposed soil |
·
Installed silt fencing near surface water channel
along DP6 channel. |
·
Improve soil covering. ·
Compaction and cover for stockpiles and soil slopes. |
|
Wetsep (treatment capacity & number) |
·
Reviewed Wetsep capacity. ·
Chemicals dosage of the Wetsep
was increased to enhance the efficiency. |
·
Install additional Wetsep. |
|
Backflow / ponding during heavy
rainfall |
·
Raised with EPD (LDG) and CEDD. |
N.A. |
The
Contractor has registered as chemical waste producer under the Contract. Sufficient numbers of receptacles were available for general
refuse collection and sorting.
As
informed by the Contractor, waste generated during this reporting period
include mainly general waste. Reference has been made to the waste flow table
prepared by the Contractor. The quantities of different types of wastes
and imported fill materials are summarized in Table 2.33.
Table 2.33
Quantities of Different Waste Generated and Imported Fill Materials
|
Month/Year |
Inert C&D Materials (a) (in ‘000m3) |
Imported Fill |
Inert Construction Waste Re-used |
Non-inert Construction Waste (c) |
Recyclable Materials (d) (in ‘000kg) |
Yard Waste (in ‘000kg) |
Chemical Wastes |
Other, e.g.
General refuse (in ‘000kg) |
|
|
Y Park |
SENT |
||||||||
|
1 – 31 Jan 26 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0.60 |
2.36 |
|
Notes: (a) Inert construction wastes
include hard rock and large broken concrete, and materials disposed as public
fill. Density assumption: 1.6 (kg/L) for public fill. (b) Imported
fill refers to materials generated from other project for on-site reuse. (c) Non-inert
construction wastes include general refuse disposed at landfill. Density assumption: 0.9 (kg/L) for
general refuse. (d) Recyclable
materials include metals, paper, cardboard, plastics and others. |
|||||||||
A summary
of the Environmental Mitigation Implementation Schedule is presented in Annex B. The necessary
mitigation measures were implemented properly for the Project.
The
operation/ restoration phase noise, water quality and landfill gas monitoring
results complied with the Action and Limit Levels in the reporting period.
Seven
exceedances of the Action and Limit Levels for TSP were recorded for air
quality monitoring in the reporting period. The TSP exceedances at AM1 and AM2
on 3 January 2026 were attributed to Project-related activities upon further
investigation, while the TSP exceedances at AM3 on 3 January 2026, 9 January
2026, 15 January 2026 and 27 January 2026, and at AM4 on 9 January 2026 were considered
as non Project-related upon
further investigation.
Cumulative
statistics on exceedances is provided in Annex H.
There were
no complaints, notification of summons or prosecution
recorded in the reporting period.
Statistics
on complaints, notifications of summons, successful prosecutions are summarised in Annex H.
As informed
by the Contractor, the major works for the Project in February 2026 will be:
• Maintenance and improvement of
temporary surface water drainage; and
• Restoration of Phase 1, Phase 2,
Phase 3 and Phase 4 slopes.
Potential
environmental impacts arising from the above upcoming construction activities
in the next reporting period of February 2026 are mainly associated with dust emission
from the exposed area and loading and unloading operation of dusty materials.
The
tentative schedule for environmental monitoring in February 2026 is provided in
Annex I.
This EM&A Report presents the findings of the EM&A
activities undertaken during the period from 1 to 31 January 2026 in accordance
with the updated EM&A Manual and the requirements of the
Environmental Permit (EP-308/2008/D).
Air quality (24-hour
TSP, odour,
thermal oxidiser and landfill gas flare stack
emission), noise,
water quality (surface water, leachate and groundwater) and landfill gas
monitoring were carried out in the reporting period. Results for air quality (odour, thermal oxidiser
and landfill gas flare stack emission), noise, water quality (surface water, leachate and
groundwater) and landfill gas monitoring complied with the Action and Limit
Levels in the reporting period.
Seven
exceedances of the Action and Limit Levels for TSP were recorded in the reporting period.
Environmental
site inspections were carried out during the reporting period. Recommendations
on remedial actions were given to the Contractor for the deficiencies
identified during the site inspections.
There were
no complaints, notification of summons or prosecution
recorded in the reporting period.
The ET will
keep track on the construction and operation/restoration works to confirm
compliance of environmental requirements and the
proper implementation of all necessary mitigation measures.